How To Install Laminate Countertops

So you've found the laminate that your looking for, the pattern, design, color and price have come together and your now ready to begin your home improvement project. The project will be lengthy but the end result will be rewarding. Whatever your goal is to improve the aesthetic of you home or to increase the value home by enhancing your kitchen the project will leave you with a feeling of accomplishment.

The first step is to prepare the surface area for the laminate sheets.

Note *

Removing adhesives, paint and varnishes is key to getting the professional result your looking for.

The second step is to prepare the laminate sheets.

a. Give yourself room for error a few centimeters to ensure the laminate fits, you can trim the sheets later to ensure you get the right fit.

b. Technique for cutting the sheets is to cut on the design side and at a low angle.

The third step is to set up the surface area and laminate sheets for placement.

Experts recommend using contact cement to bond laminate to your surface. (Epoxy adhesives will also work as a bonding agent.)

a. Be careful not to allow the cement to dry to long this can decrease the bonding strength.

b. A good rule of thumb is just that if the contact feels dry to the touch it is probably ready.
Note *
You may need an additional contact cement coat for the trim to the countertop edges.

The fourth step is placement of the laminate sheets onto the surface area.

This must be done very carefully. The bonding strength of contact cement is between 50-70% at first contact. So positioning the laminate sheets perfectly before they do contact is a must. You can do this by using strips of wood, dowel rods or wrapping paper.

The fifth step is placement of laminate sheets onto the edges.

Go slowly and press firmly to ensure the sheet is sealed to the surface at all points.

The sixth and last step touch up and clean your new countertop.